Tuesday, November 12, 2013

SITE 1.5: PREP FOR UTILITIES - STEEL

Last year when we removed the trailer we were left with a steel trailer skeleton.
Computer model of trailer steel
There was never really a doubt that we would re-purpose the steel.  We just weren't sure exactly how it would be re-used.  Sustainability and re-use of materials has been a key element of this project and the re-use of the trailer steel fit directly into that paradigm.

So one late fall afternoon as we were walking around the site and the steel, my wife Gay turned to me and said, "Why don't we cut the front of the frame off and tip it up as the garden gate?"

There was no other response that was more appropriate than, "WHAT A GREAT IDEA!".

As part of the site prep the trailer steel needed to be cut up.  It was in the way of the new utility trenches that were going to be created for new sewer, electrical and communications conduit to be installed at the site. 

Additionally, the steel - besides the garden gate - is intended to be re-used on part of the structure for the new residence.

So, Gay dusted off her oxy-acetylene tanks and cutting torch and began to take care of the steel structure.  She is a steel girl...disguised by her alter professional life of Senior Administrative Guru for one of the valley's exclusive real estate firms.  She likes steel and metal...and liked this task.  

Photo

Photo

Photo

It was an effective afternoon's work on a warm September afternoon.  The front of the trailer was separated from the rest of the pieces, ready for the next round:  re-positioning the steel and the garden gate (blog entry coming soon!).

Site prep takes a while.  Getting steel cut, moving materials out of the way to accommodate excavation equipment, verifying entry points to a building for new utilities, and miscellaneous important coordination items. 

The steel cutting was fun to watch and a clear sign that progress was imminent.



Friday, November 8, 2013

SITE 1.4: PREP FOR SITE UTILITIES

It has been a while since the last entry.  There has been a lot of work taking place.

Beginning in late August we took out three trees.  We like trees and this site had a lot of them.

Part of what I do as an architect is assess the site:  It's assets, liabilities, opportunities and options.  As part of the analysis, one tree was in the way of the proposed new residence.  It is no longer in the way.

Two other trees were in the way of foundation excavation.  We had initially determined to eliminate at least one tree to maintain the health of the others.  The second came down to make way for a larger more gracious outdoor living space to be made outside the future kitchen. 

The photo below shows the site just after the three trees were felled.  These trees were then cut and the wood stored on site for future use in the firepit.  The trunks were left a little high so the excavator could get them out reasonably easy.  I didn't want the stumps to remain as food for carpenter ants.




As hard as we try to anticipate the implications of site work such as this there are surprises.  In this case the surprise was a really good one.



The removal of the tree where the new proposed residence will be built completely opened up the sky revealing a big Western Colorado sky for sunsets.  Magnificent.  And the evening stars will also be quite stunning.

Progress.