Wednesday, June 6, 2018

Blog Re-engagement

Original Site Condition - 2012

I just spent the last two years building a house.  I did not write anything in the blog about this little endeavor, because - between doing architecture and being a general contractor - I was fairly busy and down time was used to sleep.

So, I will attempt to make up for this lapse with a few new tales, and an overview of the process, and perhaps some perspectives when an architect builds his own house.

FOUNDATION - MAY 2016
In the meantime, summer has hit the #vailvalley.  Temperatures are consistently warm early this year.  The garden is just about set.  Tomatoes, potatoes, cukes, basil, and a bunch of other good, organic food has been planted.  

The grounds are now getting attention and roses have been planted at the street corner.  The lilacs are being trimmed and cleaned up.  The plants we have been saving and nurturing are being prepared to become part of the landscaping.


So, here is the new house.   There will be more to come as I dive into some important aspects of building the house.  For now, it is functioning nicely as we head into the summer.  Cool inside while hot outside - without an air conditioner.

It is going to be very interesting to see how this #architectshouse performs as we head into what appears to be a very hot and dry summer in the central Colorado Mountains.

Monday, December 22, 2014

WINTER SOLSTICE - 2014

Yesterday we celebrated the solstice at the cabin...shortest day of the year.  We have turned this into an annual event, and work to celebrate the summer solstice as well.

It is fun to watch the sun patterns over the course of a year.  It helps to understand sun shade and shadow patterns as the planet orbits el sol.

Yesterday, however, there was no sun to see - just light.  It snowed and the temperature was great, and the fire in the firepit warmed the soul...and...


thanks to the kids - Tatiana, Gay and Jordan...we now have the first snowman to greet visitors to the cabin since we began our stewardship of the site.



Thursday, December 18, 2014

GARDEN 1.1

The initial objective of the garden work this summer was to build four raised beds that would be of a height that one could sit on a stool and garden comfortably.  

Part of the planning discussion took place in the presence of my good friend Terrill Samura (Samura and Associates Landscape Architecture).  These discussions focussed on the importance of organic methods and strategies and ergonomics.  The ergonomics piece had to do with the width of the beds so the full bed could be reached when accessing from both sides.  We determined the maximum width of a bed to be 4' which allowed a 2' reach from either side.  My arm - when fully extended - has a 29-30" reach.  My wife has about a 27" reach.  

Other considerations in the planning included:

  • The development of a possible future chicken coop and making sure we have room for it if we do that
  • Good sun
  • Vertical gardening (trellises)
  • Ability to get a garden cart between the beds
  • Irrigating each bed

The initial structural work was to set 24 posts.  Six of the posts were set to a height of approximately 7.5 feet (trellis structure).  The balance were set to receive the bed sides.  

The treated posts were set in the ground with dirt compaction.  Each post had dirt set in the holes with water to fully compact the dirt in approximately 6" lifts.  The dirt was compacted until it was real hard - then the next lift was done.  Compaction was done with a 2 x 4 and a 1 x 2 for narrow openings until each post was vertical (verified with a level) and solid.

It took a couple of weekends to get all this done.  Once the posts were in we could construct the beds and irrigation systems.






Tuesday, December 9, 2014

GARDEN 1.0

THE GARDENING BEGINS

We are getting pretty deep into winter season right now and I haven't written anything of late.  I got really busy with work - Ago Studios - and getting things done on the cabin like electrical and framing inspections and a few other things until early summer.  So I'm going to back track a bit and discuss the garden that we built this summer.  I'm going to write a few articles on the garden and I begin here....

The garden has been formulating for a while.  We always knew it would be in the Northeast corner.  It will be a good and organic garden.  It is nicely laid out to take advantage of the sun and shade.  This will - I think - be a healing garden with good food grown in a creative space.

It was wide open when we took over stewardship of this land.  The deer had free range - a problem when you want a really good garden.

Step One:  A summer ago I took advantage of some nearby road construction and gleaned some very stout 8 ft high wildlife fencing that was being removed from the side of the interstate prior to roadway construction.  That fencing was stockpiled for the garden perimeter

Step Two:  Last fall I set the treated 4 x 4 posts for the garden fence along the East edge of the garden and at the corners and  intermediate spacings along the West side.   In doing this I had to make a modification to the adjacent barbed wire fence so the deer would not be able to jump the fence to get into our garden space.

I verified this was a successful strategy.  Over the course of the winter there were no visible deer tracks or signs they had traveled through and my string sensor stretched between the fences stayed in place the entire winter.  My deer behavior modification worked...and continues to work.

Step Three:  This spring we installed the wildlife fence on the East side.  Later in the summer we installed the fence material on the West side and began to take control of the area.  Taking control of the space is an important concept because there are large 4 legged animals that roam this area.  We don't want them in the garden...and I do have a story about the fence and it's ability to contain an animal.

Step Four:
We came up with a very cost-effective construction technique for raised beds using treated 2 x 10's, pond liner fabric and treated 4 x 4's.  The bed construction began with the setting of the 4 x 4's.

An important reminder to all you who enjoy the value of building for yourself - LOCATE YOUR UTILITIES.

In my particular case I needed to locate two 2-1/2" electrical service conduits we installed last fall to make sure I knew what needed to be done if we set posts over the conduits - and sure enough we did.  I set stakes with orange flagging identifying the location and depth of the conduits and went to work. 

I then hand dug 24 holes with a post hole digger to specific depths and in a specific grid to prepare to set the 4 x 4 posts that were to receive the sides and remaining irrigation and assemblies so we can grow great rhubarb and garlic.


Monday, June 16, 2014

CABIN 1.12 CABIN BATHROOM

Sometimes one picture is all that is needed to express something.  In the case of the cabin and the re-installation of the systems...I think this is it.


The bathroom is roughed in!

This means all the plumbing has been installed.  The electrical is roughed in, with functioning lights, The water closet functions, the temporary sink functions.  We can actually wash hands in warm water for the first time since we purchased the structure!

So...in this case...the picture is worth a thousand words!



Thursday, April 10, 2014

CABIN 1.12: SYSTEM COMMISSIONING - PLUMBING

After a lot of work to remove and replace the old systems of the cabin I am starting to get some function back in the cabin.

Last fall I removed over 650 pounds of old cast iron waste line systems from the cabin.  It all went to the recycling business here in Eagle, and in one of these posts I'll provide a summary of that recycling effort.

So, after removing the waste line and installing a new sewer line to the cabin I have FINALLY, gotten the new plumbing waste system installed.  Yesterday I tested the system.  That to say I am now starting to get the plumbing systems back on line.   

When finally installed I want to make sure the integrity of the system is sound before putting it to full time / permanent use.

This is the concept of commissioning.  

There are many ways to commission systems and there are standards that are  developed for commissioning especially when testing the integrity of building systems on larger projects. Commissioning is an integral aspect of LEED projects and is now a significant part of the IGCC (International Green Construction Code).  



So as I get the active working systems of the cabin installed and back working I want to test them to make sure they are working before they are finally put to use - commissioning.

I will also note that I have asked the local building official Bob Kohrman - Town of Eagle Building Official - a lot of questions.  He has kindly indulged me and has helped a lot.   

If you are like me and doing work yourself, don't hesitate to ask questions of your building official or inspector.  They really do want to help you get the installation right.  Codes are codes, like them or not, they are in place for our safety.  And, remember, the systems you install now will more than likely be in place for a long time - fifty years maybe or more.  We need to get them right to insure the life of and safety of the system. 

Waste lines are gravity systems.  That means they must slope to allow gravity to work and move the water and waste through the system by sloping the lines.  So I wanted to check slope and the integrity of the system.

The methodology I used was simple:
1.  Pipe slope:  

  • I have a pretty good eye and most of the installed system looked to have a slope that was equal to or greater than 1/4" per foot.  One section, though, looked a little more level than the rest. 
  • The test method:  a bullet level.  When I set the small level on the suspect area the bubble moved to the right indicating there was a reasonable slope (at least 1/4" per foot).  I accepted that section.
  • I checked another couple of areas and felt pretty good about the installed nature of the system.
2.  System integrity
  • Water test:
    • This was a real simple test.  I put a hose in each of four points in the system that would have a fixture that would be an entry point for water or waste running through them.  The kitchen sink, the bathroom lavatory, the water closet and  the washer / dryer.
    • I started the hose out at low flow, primarily so I could make sure the hose would stay in the orifice at first and then as I increased the amount of water running through the system.  So ultimately I want from a low flow to maximum water volume at each point.
    • During each elevation of water volume I put my hand under each joint that would be receiving water flow to feel for any moisture - any moisture.  I did not want a stray drop of water coming through the pipes for obvious reasons.
      • One of those reasons was that when I opened the floor I found multiple breaks in the old galvanized piping and a lot of damp soil.  I don't want that in my crawl space.
    • I also visually inspected each joint with a bright flashlight to make sure I saw no water dripping.
    • The volume of water coming out of the hose was much more on a prolonged basis than the system would experience under normal operating conditions and thus was - in my professional opinion - a decent test to verify the system integrity.


As I bring the functions back to the cabin I will be commissioning each system to make sure it performs as intended before it gets to work under normal occupancy load.  It is important to do this while I still have openings in the floor so that I can reasonably access any area requiring adjustment to assure the integrity of the system prior to closing it up.

I will test the new plumbing supply lines in the same fashion.  

It is really important to note that a good commissioning of the system - no matter who installs the system - is important because whether owner installed (as is the case here) or a system installed by others (in this case the water supply plumbing) there is always the possibility a sweat joint or fitting did not get installed quite right in spite of the good intentions and craftsmanship of the tradesperson installing the system.  Especially in the case of plumbing, it is better to catch any leaks now - before putting the wall surfaces up - than finding them later with all the nasty stuff that comes with that discovery.  A plumber will appreciate the opportunity to address a pin hole leak now rather than later.

Commissioning Results:
The waste lines passed my inspection.  I observed both by visual and manual inspection of the systems. that there was no leaking in the system and the integrity of the system is sound.  I am therefore certifying the system ready for normal use.




      

Wednesday, March 19, 2014

CABIN: 1.11 INTERIOR PREP & FRAMING

It has been really great to get out of the crawl space, and get the structural work done so I can get to the point where the interior of the cabin begins to get put together.

The interior framing work began in early December.  It was really fun to cut interior framing studs on the porch in 15 degree weather - not really.  But it got done.  

A lot of framing was required because the original condition of the cabin had flat ceilings.  I removed those ceilings and am using the original roof structure as the ceiling in almost all areas.   This required new framing up high to provide nailing surfaces for interior finishes and framing for new insulation.  Existing framing that was somewhat old and questionable got an upgrade as well.



In the photo above, I'll note the installation of new 2x6 floor joists that were 'sistered' with existing to reduce the floor deflection in the bathroom area.  This will help in keeping the future tiling in the shower and bath area from cracking as a result of floor deflection.  Additionally I dropped the new floor sheathing down to be level with the top of the floor framing to allow for the installation of a new mudset sloped shower above.

SHOWER FRAMING FROM ABOVE
The shower floor framing will also allow for the installation of a linear drain and barrier free access.  Water will drain against the wall in the shower.

The finish framing in the bathroom is shown below.  There will be  a sliding door to separate the vanity area from the shower / water closet area with blocking to handle the sliding door hardware and provide additional stability to the new framing.


I have installed new interior framing in the new studio space for a number of reasons:
  • There isn't a square corner in the place
  • The walls are neither plumb nor level
  • I needed space for new electrical without chopping into the existing structure to make that space
  • New framing allows me to install new insulation to make the space more thermally efficient.



If you look closer at this photo you will see where there has been sealant applied to the cracks at the existing roof sheathing.  Sealant was also applied behind the rigid insulation (silver material in the photo) to seal the cracks a the original structure.  The new rigid insulation (3/4" polystyrene with a foil air barrier facing the interior of the space) adds additional insulative capability to the structure...and it is relatively inexpensive and easy to do.  The rigid insulation is behind the framing allowing for the installation of new electrical (yellow wiring) and new cat-6 communications cable (white wiring) for video, internet and intranet communications within the structure.

The new framing is also plumb, and square.  The sills and headers were all aligned with a laser level so visually there is harmony in the space.  While this is a lot of work it will pay off when the drywall gets applied. 

One additional benefit of the interior framing is that the window cavities will be deeper with deeper sills and greater architectural character - which as an architect I really like.



Finally, the new crawl space access was activated in the new utility area.  The new opening provides a 3' x 3' opening into the crawl space with a new access ladder so a new furnace or any other piece of equipment can be removed and installed - EASILY - without having to open the old ratty panel that was directly in front of the kitchen sink.  

The existing floor framing in the kitchen was reinforced including the installation of new ledgers along the existing concrete foundation to provide additional bearing for existing and new joists.  The framing at the old crawl space opening was awful.  The floor is much more structurally sound now than before.  

Thanks to Ron Hedrick - Hedrick Construction - for loaning me the roto-hammer used to install the new wedge anchors for the new ledgers at the foundation wall.

That old opening - while not yet completely removed is not active and will receive new sheathing and wood flooring when complete. 

I must note the crawl ladder sits on a small concrete pad secured into place with field crafted metal straps that were installed by my daughter.  I will digress for a moment.

Every now and then on a jobsite when you do it the way I am doing I get an opportunity to introduce my daughter to more construction.  In this case concrete.  Late in December we poured the last concrete in the crawl space.  Becky wanted to learn how to do concrete and we did just that.  We schlepped 10 bags of quikrete into the crawl, a wheelbarrow, shovel, hose and trowels and poured concrete.  

It is really fun to watch the light go on when a young person gets introduced to concrete for the first time and watches it turn from sandy aggregate to liquid mud to stuff that is hard as a rock. 

I then showed her how to cut and bend a piece of Simpson metal strapping to set into the concrete so it could be used to secure the base of the new crawl ladder.  I held the ladder in place while she set the straps into the concrete...and voila, the new ladder is now secure.

Coming soon...the new tankless water heater and plumbing, and more on the systems.