Tuesday, November 12, 2013

SITE 1.5: PREP FOR UTILITIES - STEEL

Last year when we removed the trailer we were left with a steel trailer skeleton.
Computer model of trailer steel
There was never really a doubt that we would re-purpose the steel.  We just weren't sure exactly how it would be re-used.  Sustainability and re-use of materials has been a key element of this project and the re-use of the trailer steel fit directly into that paradigm.

So one late fall afternoon as we were walking around the site and the steel, my wife Gay turned to me and said, "Why don't we cut the front of the frame off and tip it up as the garden gate?"

There was no other response that was more appropriate than, "WHAT A GREAT IDEA!".

As part of the site prep the trailer steel needed to be cut up.  It was in the way of the new utility trenches that were going to be created for new sewer, electrical and communications conduit to be installed at the site. 

Additionally, the steel - besides the garden gate - is intended to be re-used on part of the structure for the new residence.

So, Gay dusted off her oxy-acetylene tanks and cutting torch and began to take care of the steel structure.  She is a steel girl...disguised by her alter professional life of Senior Administrative Guru for one of the valley's exclusive real estate firms.  She likes steel and metal...and liked this task.  

Photo

Photo

Photo

It was an effective afternoon's work on a warm September afternoon.  The front of the trailer was separated from the rest of the pieces, ready for the next round:  re-positioning the steel and the garden gate (blog entry coming soon!).

Site prep takes a while.  Getting steel cut, moving materials out of the way to accommodate excavation equipment, verifying entry points to a building for new utilities, and miscellaneous important coordination items. 

The steel cutting was fun to watch and a clear sign that progress was imminent.



Friday, November 8, 2013

SITE 1.4: PREP FOR SITE UTILITIES

It has been a while since the last entry.  There has been a lot of work taking place.

Beginning in late August we took out three trees.  We like trees and this site had a lot of them.

Part of what I do as an architect is assess the site:  It's assets, liabilities, opportunities and options.  As part of the analysis, one tree was in the way of the proposed new residence.  It is no longer in the way.

Two other trees were in the way of foundation excavation.  We had initially determined to eliminate at least one tree to maintain the health of the others.  The second came down to make way for a larger more gracious outdoor living space to be made outside the future kitchen. 

The photo below shows the site just after the three trees were felled.  These trees were then cut and the wood stored on site for future use in the firepit.  The trunks were left a little high so the excavator could get them out reasonably easy.  I didn't want the stumps to remain as food for carpenter ants.




As hard as we try to anticipate the implications of site work such as this there are surprises.  In this case the surprise was a really good one.



The removal of the tree where the new proposed residence will be built completely opened up the sky revealing a big Western Colorado sky for sunsets.  Magnificent.  And the evening stars will also be quite stunning.

Progress.

Tuesday, September 3, 2013

CABIN 1.8: CRAWL SPACE EXCAVATION - PHASE 2

With the primary excavation completed it is now time to take control of the crawl space.  What does that mean?

It means getting control of the structure, the building systems (sanitary sewer) water supply, air movement (ducting) and framing of new and existing openings for crawl access.

The first priority was the structure.



Beam at left to be replaced
It helps to have a friend like Duane to assist
New Beam and columns.























The floor beam below the joists that was buried in the dirt was found by the architect to be deficient.  It had been an on-going snack for carpenter ants.  Replacing the beam required new footings for columns, temporary shoring of the existing floor, jacking up the floor to relieve the load of the joists on the beam. a new beam and columns.



Once the prep was done, the beam took about an hour to replace.


The beam that was replaced


The picture above illustrates the condition of the beam we removed and replaced.

The next effort took place beneath the main area of the cabin.  New concrete footings were set in place to receive new columns to support the existing 4 x 6 beams that were resting on some concrete block and a strategically placed stack of field stones as the supports.

The existing beam was reinforced with two 2 x 6's with 1/2" threaded rod through bolts at approximately 24" oc, a new treated 4x4 column with side supports glued and bolted to specifically support the new beams.

Column and beam reinforcement

The existing beam was reinforced with two 2 x 6's with 1/2" threaded rod through bolts at approximately 24" oc, a new treated 4x4 column with side supports glued and bolted to specifically support the new beams.

While we jacked up the floor to relieve pressure on the existing beam we also had the opportunity to adjust the level of the floor which is now more level than when we originally acquired the structure.

Just the addition of the one column mad a huge difference in the solid feel or bounce (deflection) of the floor.  It is really solid.



One more column needs to be installed to complete the task.








The photo above is the finished column to beam connection below the guest room floor.

With this phase of the structural work done it was time to move on to the plumbing and sanitary waste line - that will be the next blog entry.

Friday, August 30, 2013

CABIN 1.7: CRAWL SPACE EXCAVATION - PHASE 2

Once the framing was removed from the floors in North portion of the cabin, and the beam was reinforced with some additional bearing capacity we were ready to complete the excavation.  

The strategy was to complete the excavation in approximately five (5) hours with a four man crew.  I ended up being the fifth individual on the crew.  Three were digging and putting the excavated dirt in buckets.  I was taking the dirt and moving it to the wheelbarrow outside and one person was on wheelbarrow duty.  With five people we were able to move a lot of dirt.

The dirt was really hard requiring an electric jackhammer with both a spike and spade attachment.  The assault on the crawl excavation was also complemented by the traditional shovel and pick arsenal.

Excavated crawl space
The excavated area was sized to address two important criteria:
1.  Maintain the structural bearing slopes of the existing foundations; and,
2.  Provide access to the perimeter of the structure for the installation of new heating ducts, 
      perimeter insulation and utilities

The photo above shows the condition of all the existing framing prior to structural work that was done for the floor framing.


This view shows the excavated area which exposed the cast iron sanitary sewer lines, galvanized water supply lines. amd shows the floor beam that was buried in the ground that was damaged by carpenter ants. 

Next Post:  structural re-construction and re-inforcing.

Wednesday, August 28, 2013

CABIN 1.6: CRAWL SPACE EXCAVATION - PHASE 2

The phase 2 excavation of the crawl occurred after the floor sheathing was removed from both the bedroom, bathroom and closet.  The important part of this work at the bathroom was to expose the galvanized water piping and old cast-iron sanitary sewer piping that was under the floor joists and not accessible prior to this.  So...if there was a leak in the existing piping it would either be undiscovered for a while (and one of those leaks was discovered) and / or if repair was required the flooring would have to be removed until the piping was discovered.  And there were signs that the floor in these areas had been previously removed to access piping issues.


FLOORING REMOVED AT BATHROOM
TUB REMOVED - PLUMBING EXPOSED


The  floor sheathing was removed throughout the areas at this part of the structure including the closet area.  This gave a clear idea of the condition of the existing framing.  There was generally good news after being able to review and observe the entire state of framing.  Even though the original framing was essentially laid directly on the ground there initially appeared to be minimal issues such as wood rot or other damage.


I found a beam that had been buried in the ground to support the floor joists.  In the closet area - which is at a corner that collects water on the exterior - the framing appeared initially to be dry and in reasonable condition.  The dirt just past the beam appeared damp and after digging around appeared to be damp due to a leak in one of the galvanized water supply lines.  That line was cut and capped and the dirt dried up.  Without removing the floor and going through this exercise, that leak would have continued and ultimately would have been a problem that may not have been discovered for quite a while.

I then removed a series of floor joists to provide access for the final excavation effort.  



After opening this area up I was able to do an additional effort to look at and inspect the foundation and found that the vertical joints on the West wall had not been grouted with mortar. So, after exposing the exterior side of the foundation and mixing a bag of mortar I pointed the vertical joints with new mortar to seal the foundation.

With some additional support installed at the beam supporting the joists we were ready to complete the crawl space excavation.


Tuesday, August 27, 2013

CABIN 1.5: CRAWL SPACE EXCAVATION PHASE 2

It has been a while since posting on the construction efforts that have been underway on the cabin.  Since the last post there has been a lot of work done and I'm going to attempt to catch up over the next week or so.

When last I wrote I had laid out the rationale for the excavation of the crawl space.  The last post photo shows the floor still in place.  The floor needed to be removed in order to complete the crawl excavation process.

Exposed Original Floor Construction
Unexcavated Crawl Under Bedroom Area
The first phase of the excavation indicated the original construction of the floor at the addition was built directly on the ground.  Clearly done before building codes or building permits in the Town of Eagle.

Upon removing the floor sheathing this hypothesis was confirmed.

In order to complete the crawl access strategy we ascertained that digging down from the top would be the most efficient methodology.  This was - in fact - the case.

As I uncovered the space I found an intrusion of tree roots from the Chinese elms outside the cabin.  Unruly, large, and seemingly owning the area under the floor, the fight was on.  

Crawl Excavation - Initial Phase
Tree Roots Revealed

The first phase of the excavation was done by yours truly.  One Saturday and part of Sunday I removed 125 buckets of dirt from under the joists.  I calculated this to be approximately 3+ yards of dirt.  As sore as I was I figured I would be a candidate for Tommy Johns surgery...that was a lot of dirt to lift and move.  

You might note in the photo above to the left we used some pretty basic techniques - a red radio flyer wagon was employed to haul two buckets at a time to the wheelbarrow outside which then transferred the dirt to the pile.  One wheelbarrow took four buckets, so I moved about 32 wheelbarrows of dirt - initially.

The tree roots are visible above.   They were removed with a hatchet and saws and are drying out by the firepit for this fall's firepit enjoyment.


At the end of this phase, the photo above shows the state of the guest quarters.  The dirt was removed from below the joists to a depth of 16 -20" and the existing condition of the framing was able to be inspected.  This allowed for an inspection of the inside face of the foundation, and began the process of getting control of the area below the cabin.

Monday, June 3, 2013

CABIN 1.4: CRAWL SPACE STRATEGY

 In the last post I noted the excavation of the crawl space had begun.

The reason:  get control of the space below the cabin so all systems can be accessed from below which includes valves, water lines, electrical and communications.

Why is this important?  One of the reasons revealed itself as I was removing the floor sheathing in the bedroom:  damp soil.  The damp soil indicated a leak of some sort that needed to be fixed.  

So, how do you fix a busted pipe if you don't have access to an 80 year old galvanized pipe with a leak in it? You can either dig a new crawl space or you cut the floor out to access the pipe - assuming you have the ability to know you have a pipe leak.

BEDROOM FLOOR W/ SHEATHING
There are several building code requirements that address this situation:
1.  Access to a crawl space; 
2.  Access areas for equipment and the servicing of that equipment; and
3.  Common sense.

The photo above shows the existing floor with a doorway on the right side of the picture.  There are no access points to get to the crawl space.  With water and waste piping at the area under the door and wall at this area, and no access, one will cut the floor up to repair plumbing.

SHEATHING REMOVED
In this photo, the sheathing has been removed.
     1    Damp soil was found under the wall and near the door (plumbing leak of some sort)
     2    Dirt is up to the joists (fortunately the dirt is very dry)

This is a lot of work.  Some would ask if it is worth it.  In my professional opinion, the answer is yes.  

I will be able to add additional structure to the shower area to stiffen the floor for a new tile shower.  I will have access to the underside of the floor to address systems issues.  I will be able to install a new air distribution system that will not cut through joists to get heat deeper into the space in appropriate locations.  I'll get dirt away from the joists.  I'll be able to condition the crawl space with heated air avoiding foundation ventilation systems that introduce cold winter air that could affect water pipes, ie: freezing them - a less than optimal situation.

By digging this space out I will also be able to introduce perimeter insulation to thermally improve the space.  I'll also have room to install a vapor barrier to the space.

Since this is an 80 year old structure I will also be able to observe the framing and determine if any remedial work needs to be done in order to preserve the integrity of the structure.

The reasons for creating this excavated area far outweigh not doing the work - in my opinion.

So, the work continues.  We are close to completing the removal of the sheathing and the ability to complete the crawl space work.